Phone

(+34) 941 58 2042

Mail Us

info@kliux.com
  • Home
  • Products
    • KLiUX Vertical axis wind turbine
    • Kliux wind and solar hybrid system
    • Downloads
  • Services
    • Site Viability analysis
    • Project
  • Solutions
  • Installations
    • Grid connected installation
    • Off-grid Installation
    • Installations
  • Contact
  • Language: English
    • Español Español
    • English English
  • Home
  • Products
    • KLiUX Vertical axis wind turbine
    • Kliux wind and solar hybrid system
    • Downloads
  • Services
    • Site Viability analysis
    • Project
  • Solutions
  • Installations
    • Grid connected installation
    • Off-grid Installation
    • Installations
  • Contact
  • Language: English
    • Español Español
    • English English

Santa Engracia del Jubera 100% illuminated with LED technology

  • 16 November, 2012
  • Ahorro de energía, Edificios públicos, eficiencia energética, energía, Eventos, Kliux, Kliux Energies, noticias, renovables
  • 0 Comments

The village has installed a total of 50 LED luminaires for street lighting and reduces its electricity bill by 60%.

The energy efficiency project of Santa Engracia, developed by Kliux Energies, is the replacement of the 50 luminaries with new LED technology, providing higher light quality at lower cost. The investment of 26,000 € will be amortized over 3.3 years.

The event, held on the afternoon of Thursday, November 15, was presented by the Counselor of Industry, Innovation and Employment, D. Javier Erro, the Director General of Innovation, D. Julio A. Herreros, D. Oscar Fernandez, mayor of Santa Engracia of Jubera and D. Iñaki Eguizábal, President of Kliux Energies.

LED lighting systems installed have significant advantages over traditional systems:

  • The power of each LED lamp installed is 50 watts compared to 150 watts typically used in traditional systems. Despite the decrease of power, the lighting is higher.
  • The consumption and maintenance are lower than in traditional systems: one-third less consumption and one-third more life.
  • The lighting produced is a white light called “moonlight” getting high brightness, very similar to the natural.
Improvement data facts

POWER:
Previous: 50 mercury vapor luminaires 125 W, total power: 6.25 Kw
Current: 50 LED lights 50 w, total power 2, 5 Kw

CONSUMPTION (calculated based on 10 hours a day, 3650 h / year):
Previous: 22.812 kWh / year
Now: 9.125 kWh / year

LIGHTING:
Previous: 55 lux
Current: 40 lux

SYSTEM ENERGY EFFICIENCY:
Previous: 11 m2/lux.w
Current: 20 m2/lux.w

Kliux Energies has developed the project building on its strategic relationship with the specialist in energy efficiency and lighting, Teknica Lighting. Thus the Santa Engracia del Jubera becomes the first municipality Rioja with LED lighting technology.

  • ahorro en de energía en instalaciones públicas,
  • Ahorro factura de la luz ayuntamiento,
  • Ahorrro para ayuntamientos,
  • eficiencia energética,
  • energy efficiency and lighting,
  • energy efficiency project,
  • higher light quality at lower cost,
  • Kliux,
  • Kliux Energies,
  • LED lighting systems installed have significant advantages over traditional systems,
  • LED technology,
  • Reducir factura luz,
  • Sistemas de ahorro luz públicos,
  • Sistemas de iluminación LED,
  • Tecnología LED
Previous

KLIUX ENERGIES AND N2S JOIN FORCES TO OFFER COMPREHENSIVE SOLUTIONS FOR SMART GRIDS

Next

El aerogenerador que vuela en silencio: An article published in the magazine “Renewable Energy”

  • Español
  • English
  • About Kliux Energies
    • Vision and objectives
    • R&D Resources
    • Our Team
    • Partners and collaborators
  • News
  • FAQs
  • Gallery

© 2024 - KLiUX energies - Aviso legal
  • Applications
  • Legal Notice
  • Dealer Application Form
  • Site Map
  • Privacy Policy
  • Renewable hybrid wind solar power system for telecommunication BTS
  • Kliux Solution for Telecommunications Antennas supply
  • KLiUX Solution for instant self supply for medium and large companies
  • KLiUX solution for off grid locations
  • Kliux Solution for off grid locations with high consumptions
  • KLiUX Zebra
  • Home
  • About Kliux Energies
  • Products
    • KLiUX Vertical axis wind turbine
    • Kliux wind and solar hybrid system
    • Downloads
  • Services
    • Site Viability analysis
    • Project
  • Solutions
  • Installations
    • Grid connected installation
    • Off-grid Installation
    • Installations
      • Universidad de Zaragoza
      • Alcaidesa Links Golf Resort. San Roque, Cádiz
      • Bayer MaterialScience, Tarragona
      • Club Náutico de Porto Novo, Galicia
      • Dolmar, La Rioja
      • Hermanos Baraldés. Onda, Castellón
      • Rioja Alta Golf, Cirueña, La Rioja
      • TECNUN. Universidad de Navarra. San Sebastián, Guipúzcoa
      • Universidad de La Rioja, Logroño
  • Contact
    • Work with us
  • About Kliux Energies
    • Presentation
    • Vision and objectives
    • R&D Resources
    • Our Team
    • Partners and collaborators
  • News
  • FAQs
  • Gallery
    • Dolmar, oenological products winemaking
    • Awards La Rioja University
    • First Installation
    • Rioja Alta Golf Course
    • Zaragoza University
    • Alcaidesa Links Golf Resort
    • Bayer MaterialSciencie
    • Genera 2013
    • Kliux Energies
    • Montajes Eléctricos Hermanos Baraldés
    • Portonovo
    • Ribadeo
    • Tecnun. Escuela de Ingenieros. Universidad de Navarra.
    • Universidad de La Rioja
    • WINDPOWER EXPO 2013
  • Aviso legal
Síguenos
  • Home
  • Products
    • KLiUX Vertical axis wind turbine
    • Kliux wind and solar hybrid system
    • Downloads
  • Services
    • Site Viability analysis
    • Project
  • Solutions
  • Installations
    • Grid connected installation
    • Off-grid Installation
    • Installations
  • Contact
  • Language: English
    • Español Español
    • English English
Síguenos