Phone

(+34) 941 58 2042

Mail Us

info@kliux.com
  • Home
  • Products
    • KLiUX Vertical axis wind turbine
    • Kliux wind and solar hybrid system
    • Downloads
  • Services
    • Site Viability analysis
    • Project
  • Solutions
  • Installations
    • Grid connected installation
    • Off-grid Installation
    • Installations
  • Contact
  • Language: English
    • Español Español
    • English English
  • Home
  • Products
    • KLiUX Vertical axis wind turbine
    • Kliux wind and solar hybrid system
    • Downloads
  • Services
    • Site Viability analysis
    • Project
  • Solutions
  • Installations
    • Grid connected installation
    • Off-grid Installation
    • Installations
  • Contact
  • Language: English
    • Español Español
    • English English

How much energy does the Kliux Zebra generate in 1 year?

  • Español
  • English
  • About Kliux Energies
    • Vision and objectives
    • R&D Resources
    • Our Team
    • Partners and collaborators
  • News
  • FAQs
  • Gallery

  • 20 April, 2012
  • 0 Comments

The amount of energy generated by the aerogenerator depends greatly on the average annual wind speed.  For example, on a site with 4 m/s annual average wind speed, the energy produced is 736 kWh, whilst with 11 m/s this multiplies to exceed 6.892 kWh. Kliux’s technical team adapts the turbine based on the average wind speed of the location to obtain the maximum potential output.

Previous

What is the nominal power of the Kliux Zebra?

Next

What are the dimensions of the Kliux aerogenerator?

© 2024 - KLiUX energies - Aviso legal
  • Applications
  • Legal Notice
  • Dealer Application Form
  • Site Map
  • Privacy Policy
  • Renewable hybrid wind solar power system for telecommunication BTS
  • Kliux Solution for Telecommunications Antennas supply
  • KLiUX Solution for instant self supply for medium and large companies
  • KLiUX solution for off grid locations
  • Kliux Solution for off grid locations with high consumptions
  • KLiUX Zebra
  • Home
  • About Kliux Energies
  • Products
    • KLiUX Vertical axis wind turbine
    • Kliux wind and solar hybrid system
    • Downloads
  • Services
    • Site Viability analysis
    • Project
  • Solutions
  • Installations
    • Grid connected installation
    • Off-grid Installation
    • Installations
      • Universidad de Zaragoza
      • Alcaidesa Links Golf Resort. San Roque, Cádiz
      • Bayer MaterialScience, Tarragona
      • Club Náutico de Porto Novo, Galicia
      • Dolmar, La Rioja
      • Hermanos Baraldés. Onda, Castellón
      • Rioja Alta Golf, Cirueña, La Rioja
      • TECNUN. Universidad de Navarra. San Sebastián, Guipúzcoa
      • Universidad de La Rioja, Logroño
  • Contact
    • Work with us
  • About Kliux Energies
    • Presentation
    • Vision and objectives
    • R&D Resources
    • Our Team
    • Partners and collaborators
  • News
  • FAQs
  • Gallery
    • Dolmar, oenological products winemaking
    • Awards La Rioja University
    • First Installation
    • Rioja Alta Golf Course
    • Zaragoza University
    • Alcaidesa Links Golf Resort
    • Bayer MaterialSciencie
    • Genera 2013
    • Kliux Energies
    • Montajes Eléctricos Hermanos Baraldés
    • Portonovo
    • Ribadeo
    • Tecnun. Escuela de Ingenieros. Universidad de Navarra.
    • Universidad de La Rioja
    • WINDPOWER EXPO 2013
  • Aviso legal
Síguenos
  • Home
  • Products
    • KLiUX Vertical axis wind turbine
    • Kliux wind and solar hybrid system
    • Downloads
  • Services
    • Site Viability analysis
    • Project
  • Solutions
  • Installations
    • Grid connected installation
    • Off-grid Installation
    • Installations
  • Contact
  • Language: English
    • Español Español
    • English English
Síguenos